At estimated cost of $11,000,000, two tunnels are to be built to facilitate movement of traffic at St Remi Street and Atwater Avenue; plans for St Remi project provide for two roadways 24 1/2 ft wide with vertical clearance of 14 ft; 8-ft sidewalk for pedestrians; length of tunnel will be 485 ft while oa length will be 2500 ft including approaches; plans for Atwater project are not yet complete.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    New vehicular tunnels for Montreal


    Weitere Titelangaben:

    Can Transportation



    Erscheinungsdatum :

    1949


    Format / Umfang :

    2 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Vehicular tunnels in United States

    Thonet | Engineering Index Backfile | 1931


    Vehicular tunnels through missionary ridge

    Kavanagh, G.R. | Engineering Index Backfile | 1928



    Replaceable sectional paving for vehicular tunnels

    Goertz, A. | Engineering Index Backfile | 1933


    Method of operating Holland vehicular tunnels

    Engineering Index Backfile | 1927