Installation on 14 mi of single track line between Grand Junction, Colo, and Palisade, including 12 power switches and 25 controlled signals, has effected saving of 16 min for each westward freight train and relieved congestion of trains during autumn seasons of peak traffic.
Centralized traffic control on Denver and Rio Grande western
Ry Signaling
Railway Signaling ; 31 , n 2
1938
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Centralized traffic control on Denver and Rio Grande western
Engineering Index Backfile | 1938
C.T.C. on Denver and Rio Grande Western
Engineering Index Backfile | 1937
Denver and Rio Grande western uses car dumper
Engineering Index Backfile | 1924
New motive power for Denver and Rio Grande Western Railroad
Engineering Index Backfile | 1938
New motive power for Denver and Rio Grande Western Railroad
Engineering Index Backfile | 1938