Drilling bore 9 in. in diam and 112 ft long under highway without interrupting traffic to facilitate gas pipe line crossing; drilling is performed by Ka-Mo pneumatic earth auger moving at rate from 8 to 12 in. per min.
Major highway crossed without serious traffic lag
Gas
Gas ; 31 , n 7
1955
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Highway Drainage Restored Without Stopping Traffic
British Library Online Contents | 1995
New Jersey starts "dual-dual" highway to end serious traffic congestion
Engineering Index Backfile | 1947
|New Jersey starts "dual-dual" highway to end serious traffic congestion
Engineering Index Backfile
|Influence of major highway improvements on traffic accidents
Engineering Index Backfile | 1937
|The traffic characteristics of major highway section in China
British Library Conference Proceedings | 2000
|