Reconstruction of wharf in British Cameroons; new works include main and lighter wharves designed for deck loading of 3 cwt per sq ft; use of 3-ton mobile cranes and steam and diesel locomotives with total axle load of 20 tons; main wharf is 448 ft long and 50 ft wide; screwcrete piles are utilized for both structures.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    New wharf at port of Tiko


    Weitere Titelangaben:

    Dock Harbour Authority


    Erschienen in:

    Erscheinungsdatum :

    1954


    Format / Umfang :

    3 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Moturoa wharf -- Port Taranaki

    Morrison, W.G. / Butcher, G.W. | Engineering Index Backfile | 1958


    6 Wharf Revetment – Napier Port

    Satterthwaite, Kane / Chisnall, Daniel / Vos, Michel de | TIBKAT | 2023


    Cellular Cofferdam Wharf Extension for Port

    Hubler, C. A. / ASCE / Committee on Ports and Harbors| Permanent International Association of Navigation Congresses et al. | British Library Conference Proceedings | 1995


    Modern wharf improvements and port facilities

    Crowell, Foster | Engineering Index Backfile | 1897


    Port and wharf floating pollutant cleaning device

    HUO ZHONGYAN / QIAN GUANGXUAN / CHEN WEI | Europäisches Patentamt | 2023

    Freier Zugriff