Main bridge, 3524 ft 10 in. long, consists of three 267-ft deck truss spans, one 330-ft deck truss span, one 528-ft 2 1/2-in. simple through-truss span and three-span through-truss cantilever structure made up of 790-ft central span and two 528-ft 2 1/2-in. flanking span; silicon steel used in railway floor system, designed to accommodate both railroad and highway traffic.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Great bridge at New Orleans nearing completion


    Weitere Titelangaben:

    Ry Age


    Erschienen in:

    Railway Age ; 99 , n 11


    Erscheinungsdatum :

    1935


    Format / Umfang :

    6 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :



    Cleveland terminal project nearing completion

    Faust, C.A. | Engineering Index Backfile | 1929



    New Niagara Gorge arch nearing completion

    Engineering Index Backfile | 1924


    First railway in Bermuda nearing completion

    Clarke, H.D. | Engineering Index Backfile | 1931