Construction of Southern Pacific main line diversion round Shasta dam reservoir involved special measures to insure stable formation and reduce initial maintenance; unusually careful measures were also taken to provide against earthquake damage.
Modern American railway construction methods
Ry Gaz
Railway Gazette and Railway News ; 76 , n 6
1942
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Modern methods in railway tunnel construction
Engineering Index Backfile | 1915
|Modern British railway carriage construction
Engineering Index Backfile | 1934
Modern railway motor design and methods of construction
Engineering Index Backfile | 1916
Construction of a modern railway motor
Engineering Index Backfile | 1912
Modern management models for railway construction project
IuD Bahn | 2006
|