Methods used at Walsh-Kaiser shipyards in building hull of 426-ft. 4025-ton ship; 40 all welded steel sections built by pre-assembly methods involving repetitive operations.
Combat cargo ships
Construction Methods
Construction Methods and Equipment ; 27 , n 2
1945
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
TIBKAT | 1979
|Engineering Index Backfile | 1953
|Engineering Index Backfile | 1939
|Engineering Index Backfile | 1933
Engineering Index Backfile | 1939
|