The subject of the article is the time-cost analysis of the risk of actions taken in the reconstruction of technical infrastructure (in particular housing) in the areas after the disaster on the example of Syria. As a result of the analysis of actions taken at the reconstruction of the technical (housing) infrastructure in the areas after the disaster, an attempt was made to identify the inconveniences in the management of the risk of targeted activity after the incident. Requests for efficient planning of technical (residential) infrastructure projects have been developed, including foreseeable future natural hazards.


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    The Concept of Risk Analysis of Actions Taken in the Reconstruction of Technical Infrastructure in the Areas After the Disaster on the Example of Syria


    Beteiligte:
    Nasan Agha Weam (Autor:in) / Szpytko Janusz (Autor:in)


    Erscheinungsdatum :

    2020




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Unbekannt




    The Intelligent Transport System Concept for Post - Disaster Infrastructure Under Reconstruction

    Agha, Weam Nasan / Szpytko, Janusz | British Library Conference Proceedings | 2019


    Post-Disaster Reconstruction of Road Infrastructure

    Akvan Gajanayake / Tehmina Khan / Guomin Zhang | DOAJ | 2020

    Freier Zugriff

    Economic reconstruction in Syria proceeds slowly

    McGonigal, D.F. | Engineering Index Backfile | 1930