Rail mounted gantry crane (RMGC) scheduling is important in reducing makespan of handling operation and improving container handling efficiency. In this paper, we present an RMGC scheduling optimization model, whose objective is to determine an optimization handling sequence in order to minimize RMGC idle load time in handling tasks. An ant colony optimization is proposed to obtain near optimal solutions. Computational experiments on a specific railway container terminal are conducted to illustrate the proposed model and solution algorithm. The results show that the proposed method is effective in reducing the idle load time of RMGC.


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    Rail Mounted Gantry Crane Scheduling Optimization in Railway Container Terminal Based on Hybrid Handling Mode


    Beteiligte:
    Li Wang (Autor:in) / Xiaoning Zhu (Autor:in)


    Erscheinungsdatum :

    2014




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Unbekannt




    Novel rail-mounted type gantry container crane

    LIU JIWEI / GAO GUOTAO / WANG LEILEI et al. | Europäisches Patentamt | 2015

    Freier Zugriff

    Automatic eight-rope upper rack of container rail-mounted gantry crane

    LIU GANG / LUO JINGUI / YANG SHAOBO et al. | Europäisches Patentamt | 2016

    Freier Zugriff

    Rail-mounted gantry crane girder hoisting process

    CHEN FAN / HAN DONGXUAN / WANG CHANGTANG et al. | Europäisches Patentamt | 2024

    Freier Zugriff

    Rail-mounted gantry crane anti-running brake

    ZHANG YUCAN / TENG YUNLONG / FENG XIANGLIN | Europäisches Patentamt | 2023

    Freier Zugriff

    Rail-mounted gantry crane safety operation device

    AI MINGFEI / ZHANG SHUZHONG / YU XINQIANG et al. | Europäisches Patentamt | 2025

    Freier Zugriff