The article discusses the issue of selection of the technical measures and the means of transport to carry out the executive and transport operations transport infrastructure investment: the chains of suppliers on the example of transport task, in production - for example the building transport infrastructure investment and in the storage warehouse. The developed method allows to determine the construction schedule (determination of the order of operations performed optimal technical measures and optimal means of transport) with the optimal function criterion (cost / time). The simulations have shown that this method allows an unambiguous selection of the technical measures and means of transport (vehicles) to implement the particular technological operations at a given time/cost, taking into account the established constraints.
The selection of transportation means for technological processes
2015
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Metadata by DOAJ is licensed under CC BY-SA 1.0
Technical and Technological Forms of Transportation Means in 21st Century Europe ...
DOAJ | 2012
|FLOOR ASSEMBLY FOR A TRANSPORTATION MEANS, TRANSPORTATION MEANS SECTION, AND TRANSPORTATION MEANS
Europäisches Patentamt | 2018
|Europäisches Patentamt | 2022
|