The purpose of this study is to evaluate various means of wind power turbines installation in the Korean west–south wind farm (Test bed 100 MW, Demonstrate site 400 MW). We presented the marine environment of the southwest offshore wind farm in order to decide the appropriate installation vessel to be used in this site. The various vessels would be WTIV (Wind turbine installation vessel), jack-up barge, or floating crane … etc. We analyzed the installation cost of offshore wind turbine and the transportation duration for each vessel. The analysis results showed the most suitable installation means for offshore wind turbine in the Korean west–south wind farm.
Comparative evaluation of different offshore wind turbine installation vessels for Korean west–south wind farm
2017
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Metadata by DOAJ is licensed under CC BY-SA 1.0
Offshore Installation Vessels — High demand for wind farm installation vessels
Online Contents | 2010
Offshore - Installation vessels - Specialisation breeds new generation of wind farm vessels
Online Contents | 2012
Offshore wind turbine installation ship and offshore wind turbine installation method
Europäisches Patentamt | 2022
|