To satisfy the adaptability of forecasting the short-term and abrupt volume of the initial metro network, we build the multiple enter linear regression (MELR) model to explore the determinants and forecast the intensity during the twice expansion of the initial metro network in Xi’an. We further compare the prediction of the metro transport capacity between the MELR models with exponential smoothing and autoregressive integrated moving average (ARIMA) models. Results show that the passenger intensity significantly fluctuates with the months and days, and MELR model is more adapted for the short-term prediction of the abrupt volume than the ARIMA model during the new metro line opening and the old line expands, which avoids the drawback of time series models that need a huge database. This study provides a guide for the prediction of initial metro network volume and accurate purchase of the rail vehicles during the metro planning and expends stages.


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    Influential Factor Analysis and Prediction on Initial Metro Network Ridership in Xi’an, China


    Beteiligte:
    Tao Lyu (Autor:in) / Mingfei Xu (Autor:in) / Jia Zhang (Autor:in) / Yuanqing Wang (Autor:in) / Liu Yang (Autor:in) / Yanan Gao (Autor:in)


    Erscheinungsdatum :

    2022




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Unbekannt




    Study of Distribution of Weekly Metro Ridership of Xi'an Metro

    Tao, Si-ran / Chen, Kuan-min / Ma, Chao-qun | ASCE | 2014


    Effects of built environment on metro ridership at a microscopic scale: a case study of Xi’an, China

    Zhang, Siyi / Wang, Yonggang / Liu, Zixuan et al. | Taylor & Francis Verlag | 2024


    Short-Term Metro Ridership Prediction During Unplanned Events

    Zhao, Yangyang / Ma, Zhenliang / Jiang, Xinguo et al. | Transportation Research Record | 2021


    Initiatives boost metro ridership and revenue

    Anderson, Paul | IuD Bahn | 2005