In order to further improve the normative basis of airdrome pavement projecting for increasing it efficiency considered is the problem of determining the time needed to dry the drainage layer, its capacity and hydraulic slope and to obtain the best economic results. Here we give the results which can be used for substantiation and perfection of airdromes pavement norms, also for hydrogeological calculation of drainage pavements with increased efficiency of draining the surface and subterranean water
How to determine the time needed to dry the drainage layer of airdrome pavement
1998
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Metadata by DOAJ is licensed under CC BY-SA 1.0
Night flying equipment for the airdrome
Engineering Index Backfile | 1927
|Multilayer airdrome pavement modeling on the base of numeically-analythical method of potential
DOAJ | 2004
Air power as affected by airdrome construction
Engineering Index Backfile | 1948
|