The creation of the cascade of hydroelectric power stations in Dnepr-river channel was accompanied by creation of artificial water basins. Change of hydro-geological conditions has resulted in flooding of adjoining territories and necessity of maintenance of the operational suitability of buildings and constructions located on them. The results of works on restoration of automobile overbridge above railroad tracks with intensive movement of trains in the city of Nikopollocated on the coast ofKakhovskoewater basin are presented. During operation more than 40 years, the inadmissible deformations in the above-ground overbridge constructions, caused by non-uniform settlements of foundations of supports, have taken place. The non-uniformity of foundations settlements has achieved 600 mm. The foundations settlements were due to the changes of physical-and-mechanical characteristics of loessial soil of foundation owing to heaving of the underground water level.


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    EXPERIENCE OF STRENGTHENING BASES OF EMERGENCY BRIDGE


    Beteiligte:
    V. F. Hrechko (Autor:in) / O. V. Hrechko (Autor:in)


    Erscheinungsdatum :

    2010



    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Unbekannt





    Measures of strengthening bridge and tunnel management

    Studiengesellschaft für den kombinierten Verkehr e.V. | IuD Bahn | 2004


    Strengthening the Balawali ganges railway bridge, India

    Swain, L.H. | Engineering Index Backfile | 1925


    The strengthening and refurbishment of Nell Railway Bridge

    Collard-Jenkins, S. | British Library Online Contents | 1996


    Bridge assessment and strengthening: principles and practical issues

    Das, P. C. / Planning and Transport Research and Computation | British Library Conference Proceedings | 1994