The City of Stockton Municipal Utilities Department has completed their Delta Water Supply Project (DWSP) at a cost of $200 million. This progressive design build project was completed by CDM Constructors, Inc. (CCI) as the prime contractor for the project. The project includes more than 12 miles of a 54-inch diameter raw water pipeline that will transport surface water from the San Joaquin River to the new 30-million-gallon-per-day (mgd) treatment plant. More than 7 miles of 36- and 54-inch-diameter treated water pipelines connect the new water treatment plant to the city's existing distribution system. The pipeline construction involved several challenges including difficult soil conditions, groundwater dewatering and tunnel crossings of major canals, interstate highway, railroad and major roadways.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Stockton Delta Water Project Construction Challenges


    Beteiligte:

    Kongress:

    Pipelines Conference 2012 ; 2012 ; Miami Beach, Florida


    Erschienen in:

    Erscheinungsdatum :

    17.08.2012




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    Stockton to expand FTZ

    British Library Online Contents | 2009


    Stockton Ship Channel

    Engineering Index Backfile | 1936


    Stockton and Darlington Railway

    Stockton and Darlington Railway | TIBKAT | 1838


    Stockton Beach Erosion, Monitoring & Management

    Moratti, M. / New Zealand Coastal Society | British Library Conference Proceedings | 1997


    History of Stockton ship channel

    Engineering Index Backfile | 1941