After 10 years of service, the condition of two innovative PCC pavements, designed with a reduced number of joints, is reported. A third pavement, a conventional PCC pavement, was constructed at the same time. The performance of the two innovative pavements is compared to the performance of the conventional PCC pavement.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    10 Year Performance of Innovative Pavements Greater Rockford Airport


    Beteiligte:

    Kongress:

    Airfield Pavements Specialty Conference 2003 ; 2003 ; Las Vegas, Nevada, United States


    Erschienen in:

    Erscheinungsdatum :

    2004-02-06




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    10 Year Performance of Innovative Pavements: Greater Rockford Airport

    Herrin, S. M. / Naughton, J. E. / Transportation & Development Institute | British Library Conference Proceedings | 2003


    Rockford starts trolley bus service

    Engineering Index Backfile | 1930


    Rockford and interurban railway co.

    Engineering Index Backfile | 1903