After 10 years of service, the condition of two innovative PCC pavements, designed with a reduced number of joints, is reported. A third pavement, a conventional PCC pavement, was constructed at the same time. The performance of the two innovative pavements is compared to the performance of the conventional PCC pavement.
10 Year Performance of Innovative Pavements Greater Rockford Airport
Airfield Pavements Specialty Conference 2003 ; 2003 ; Las Vegas, Nevada, United States
Airfield Pavements ; 170-184
2004-02-06
Aufsatz (Konferenz)
Elektronische Ressource
Englisch
10 Year Performance of Innovative Pavements: Greater Rockford Airport
British Library Conference Proceedings | 2003
|Rockford starts trolley bus service
Engineering Index Backfile | 1930
Rockford and interurban railway co.
Engineering Index Backfile | 1903
PTO Line Means New Direction For Rockford
Online Contents | 1995
New Rockford On-Highway Fan Drives
Online Contents | 1996