Quay crane scheduling and yard truck scheduling are two highly interrelated important problems in container terminals. Most studies have attempted to optimize each of these two problems independently. However, there exists delay in quay crane or yard truck that would decrease handling efficiency; so, this paper studies quay crane scheduling and yard truck scheduling in an integrated manner. To increase the utilization rate of resources and to reduce the rate of yard truck empty running, this problem uses the dual-cycling strategies. Due to the intractability of this problem, we design a genetic algorithm to acquire the near-optimal solutions.
Integrated Quay Crane and Yard Truck Schedule for the Dual-Cycling Strategies
17th COTA International Conference of Transportation Professionals ; 2017 ; Shanghai, China
CICTP 2017 ; 1346-1357
2018-01-18
Aufsatz (Konferenz)
Elektronische Ressource
Englisch
Simultaneous Load Scheduling of Quay Crane and Yard Crane in Port Container Terminals
Online Contents | 2009
|Simultaneous Load Scheduling of Quay Crane and Yard Crane in Port Container Terminals
Transportation Research Record | 2009
|