The Pier T Marine Terminal is a new 375-acre (151.8 ha) container terminal being developed on the site of the former Long Beach Naval Complex. The Naval Complex was closed by the Navy in 1995 and turned over to the Long Beach Harbor Department for development. To meet the aggressive schedule for the development, a phased program for design and construction of the terminal was developed that allowed demolition, filling and generic site improvements to proceed in advance of a lease agreement with a tenant and while planning and design of the tenant-related improvements was accomplished. A program was developed that included 18 construction contracts totaling over $325 million, excluding cranes and equipment. This paper discusses the planning, design and construction aspects of the project.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Pier T Marine Terminal Development, Port of Long Beach, California


    Beteiligte:
    Watson, Wade (Autor:in) / Steinberg, Ari (Autor:in) / Fredrickson, Ken (Autor:in)

    Kongress:

    Ports Conference 2001 ; 2001 ; Norfolk, Virginia, United States


    Erschienen in:

    Erscheinungsdatum :

    27.04.2001




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    Development of the Proposed Pier T Container Terminal at the Port of Long Beach, California

    Watson, W. / Steinberg, A. / Leue, M. et al. | British Library Conference Proceedings | 1998



    Port of Long Beach, California

    Engineering Index Backfile | 1949


    Port of Long Beach Marine Maintenance Dock Facilities at Pier D, Berth 48, Project

    Aguilar, Joel / Lai, Cheng / Tuladhar, Prabin et al. | TIBKAT | 2019


    Port of Long Beach Marine Maintenance Dock Facilities at Pier D, Berth 48, Project

    Aguilar, Joel / Lai, Cheng / Tuladhar, Prabin et al. | ASCE | 2019