The Wuhekou Cable-Stayed Bridge has a central span of 370m, which features two towers, two cable planes, and a floated deck system. The 38.6m monolithic deck structure is the widest in China. The standard deck section is a fully pre-stressed concrete box girder, which is strengthened by spaced cross beams and longitudinal stringers, providing enough bending and torsion stiffness for this wide long-span girder. The deck was constructed using a balanced cantilever method with specially designed travelers, supported with a cable on each cycle during casting. Epoxy coated parallel strands and high performance concrete were used to improve the bridge's durability.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Construction Techniques for the Wuhekou Cable-Stayed Bridge


    Beteiligte:
    Wang, Yongan (Autor:in) / Jiang, Zhusheng (Autor:in) / Liu, Shitong (Autor:in) / Xue, Zhengqun (Autor:in) / Parkhurst, Scot (Autor:in)

    Kongress:

    First International Symposium on Transportation and Development Innovative Best Practices ; 2008 ; Beijing, China



    Erscheinungsdatum :

    04.04.2008




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    Construction Techniques for the Wuhekou Cable-Stayed Bridge

    Wang, Y. / Jiang, Z. / Liu, S. et al. | British Library Conference Proceedings | 2008


    Cable-stayed bridge deck crane for hoisting large-tonnage cable-stayed bridge steel beam and construction method

    LU GUANNAN / WU RUIHUAN / ZHANG HUAWU et al. | Europäisches Patentamt | 2025

    Freier Zugriff

    Construction elevator arrangement method for cable-stayed bridge

    CHEN PENGFEI / HUANG DELI / GONG JUNJIAN et al. | Europäisches Patentamt | 2024

    Freier Zugriff

    Missouri Cable-Stayed Bridge Opens

    British Library Online Contents | 2004