This new North Parallel Runway complex costs approximately $300 million, including land acquisition of 1,500 acres costing approximately $100 million. This runway 8L-26R is 5000 feet north of the existing Runway 8R-26L in order to facilitate simultaneous landings on both runways. This runway will be 9000 feet long by 150 feet wide with 35-foot wide shoulders on each side. This runway will have an ILS category III on both ends.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    New North Parallel Runway 8L-26R at Bush Intercontinental Airport of Houston


    Beteiligte:

    Kongress:

    Airfield Pavements Specialty Conference 2003 ; 2003 ; Las Vegas, Nevada, United States


    Erschienen in:

    Erscheinungsdatum :

    2004-02-06




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    New North Parallel Runway 8L-26R at Bush Intercontinental Airport of Houston

    Godiwalla, A. / Transportation & Development Institute | British Library Conference Proceedings | 2003


    Whitetopping of Runway 15R-33L and New Taxiway: Bush Intercontinental Airport, Houston, Texas

    Godiwalla, A. M. / Little, D. N. / StJohn, W. S. et al. | British Library Conference Proceedings | 2000



    Ten Year Assessment and Rehabilitation-Runway 9-27 LCF Pavement: George Bush Intercontinental Airport-Houston

    Treybig, H. J. / Godiwalla, A. / Little, D. N. et al. | British Library Conference Proceedings | 1998


    Rehabilitation of Runway 9-27 at Intercontinental Airport of Houston (IAH)

    Godiwalla, A. / Treybig, H. J. / Little, D. | British Library Conference Proceedings | 2000