There are some problems in the reconstruction design of interchange station for lack of specific guiding principle. We simulate three metro stations in Guangzhou, which will be changed from common stations to interchange stations. By analyzing simulation results, three general problems about structures of the concourse, stairs, conflict points in the concourse are summarized and discussed in detail. Besides, corresponding solutions are put forward. In the design phase of the former line, the concourse should be designed for all lines and stairs that connect the concourse and the platform should be widen. While in the design phase of the latter line, interchange modes should be designed as “direct interchange” or be combined “interchange through concourse” with “direct interchange”.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Analyzing and Solving Problems in the Reconstruction of Interchange Stations Based on Simulation Method


    Beteiligte:
    Ma, Jie (Autor:in)

    Kongress:

    15th COTA International Conference of Transportation Professionals ; 2015 ; Beijing, China


    Erschienen in:

    CICTP 2015 ; 1653-1663


    Erscheinungsdatum :

    2015-07-13




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch



    Interchange

    Giblin, Jim | Online Contents | 2006


    POWER INTERCHANGE CONTROL DEVICE AND METHOD FOR POWER INTERCHANGE

    OGAWA AKIHIRO / HOSOI TAKAHISA | Europäisches Patentamt | 2024

    Freier Zugriff

    Context-Sensitive Design Resolves Interchange Problems

    British Library Online Contents | 2005



    STEEL INTERCHANGE

    Online Contents | 2007