First driverless line in Spain, the new metro line 9 under construction will soon become the backbone of the Barcelona's public transport system. Early March 2003, GISA — Generalidat de Catalunya — awarded Siemens Transportation Systems and its consortium the contract for equipping the line 9 with CBTC for driverless train operation. The CBTC system will equip 50 steel-wheeled trains running on 42 km of line. The paper provides an overview of the driverless signalling project.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Barcelona Line 9 – The First Driverless Metro in Spain


    Beteiligte:
    Braban, Corinne (Autor:in) / Yelloz, Gérard (Autor:in)

    Kongress:

    10th International Conference on Automated People Movers ; 2005 ; Orlando, Florida, United States


    Erschienen in:

    Erscheinungsdatum :

    25.04.2005




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    Barcelona Line 9-The First Driverless Metro in Spain

    Braban, C. / Yelloz, G. / Transportation & Development Institute (American Society of Civil Engineers) | British Library Conference Proceedings | 2005



    Metro line m2 in Lausanne - first metro driverless in Switzerland

    Lortscher, M. / Buthion, M. / Goy, P. et al. | British Library Online Contents | 2008



    The future lies in driverless metro

    Knutton, Mike | IuD Bahn | 2002