The Port of Long Beach will construct six mega container terminals during the coming decade to respond to a forecast of doubling in international trade. The effort will expand the Port's container acreage area by 900 acres and combine existing areas to create terminals over 300 acres in size. This paper outlines the different terminals and the steps to be taken by Port staff to build new and expanded facilities. When completed, the projects are expected to cost approximately $2 billion. This effort is in addition to other ongoing capital improvements the Port will be undertaking during the decade to modernize and continue to lead the nation in container traffic.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Port of Long Beach Mega Container Terminal Program


    Beteiligte:
    Thiessen, Doug (Autor:in) / Moro, Al (Autor:in)

    Kongress:

    Ports Conference 2001 ; 2001 ; Norfolk, Virginia, United States


    Erschienen in:

    Erscheinungsdatum :

    2001-04-27




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    Analyis and Design of a Container Terminal Wharf at the Port of Long Beach

    Johnson, R. K. / Riffenburgh, R. / Hodali, R. et al. | British Library Conference Proceedings | 1998


    Port of long beach

    Crane, D. | Engineering Index Backfile | 1947


    Port of Long Beach

    Engineering Index Backfile | 1950


    Conceptual Planning and Analysis of the Proposed Naval Station Container Terminal, Port of Long Beach

    Farrell, B. R. / Woodman, R. A. / American Society of Civil Engineers; Committee on Ports and Harbors et al. | British Library Conference Proceedings | 1998


    Development of the Proposed Pier T Container Terminal at the Port of Long Beach, California

    Watson, W. / Steinberg, A. / Leue, M. et al. | British Library Conference Proceedings | 1998