To increase the capacity and efficiency of transporting waste by rail to an existing landfill, Enviro Solutions Inc., the landfill owner, and CSX Transportation (CSXT), the rail line owner, sought the ability to use larger flat cars and gondolas. However, this would require expanding clearance of the Princess Tunnel, an existing tunnel along the rail line. The landfill facility is located in Ashland, KY, near the end of CSXT’s Appalachian Kanawha Lexington Industrial Track.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Railroad Tunnel Clearance Improvement and Linear Replacement: What Happens with Unexpected Ground Conditions during Tunnel Construction?


    Beteiligte:

    Erschienen in:

    Erscheinungsdatum :

    2021-01-01


    Format / Umfang :

    82017-01-01 pages




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Unbekannt




    Railroad tunnel in Montana

    Jacobson, A. | Engineering Index Backfile | 1945


    Hudson River tunnel railroad terminal

    Buchholz, C.W. | Engineering Index Backfile | 1892


    Driving record-size railroad tunnel

    Engineering Index Backfile | 1949


    Utah copper company builds railroad tunnel

    Crowley, A.S. | Engineering Index Backfile | 1945