To increase the capacity and efficiency of transporting waste by rail to an existing landfill, Enviro Solutions Inc., the landfill owner, and CSX Transportation (CSXT), the rail line owner, sought the ability to use larger flat cars and gondolas. However, this would require expanding clearance of the Princess Tunnel, an existing tunnel along the rail line. The landfill facility is located in Ashland, KY, near the end of CSXT’s Appalachian Kanawha Lexington Industrial Track.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Railroad Tunnel Clearance Improvement and Linear Replacement: What Happens with Unexpected Ground Conditions during Tunnel Construction?


    Beteiligte:

    Erschienen in:

    Erscheinungsdatum :

    01.01.2021


    Format / Umfang :

    82017-01-01 pages




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Unbekannt




    Planning, study and construction of railroad tunnel

    Diaz, E.C. | Engineering Index Backfile | 1951


    Railroad tunnel in Montana

    Jacobson, A. | Engineering Index Backfile | 1945



    The Pennsylvania railroad tunnel bridge

    Engineering Index Backfile | 1902