This study investigated the influence of material time-dependent performance on a PSC box girder bridge. We prepared 24 sets of standard prismatic concrete specimens in the construction site and synchronous maintenance in the deck for 3, 5, 7, 14, 28, and 60 days of concrete specimen mechanical testing. The relationship among early-age concrete axial compressive strength, elastic modulus, and curing time was established, and then the function equation among them was optimized. The state of stress and deflection of the main beam in the maximum cantilever stage of the PSC box girder bridge considering time-dependent performance were analyzed by using the finite-element software Midas civil, and the analysis results were compared with the calculation results of the standard value. Data show that the growth of the elastic modulus of early-age concrete lags behind the development of axial compressive strength. In consideration of the material’s time-dependent performance, the maximum stress variation on top of the box girder is 2.22%, whereas the variation at the lower edge is 1.02% in the stages. Thus, the effect of material time variation on stress is small. The maximum displacement is 12.3 mm, whereas the current step displacement is 5.1 mm in the maximum cantilever stage. Thus, the displacement is deeply influenced by the material time-dependent performance.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Influence of Material Time-Dependent Performance on the Cantilever Construction of PSC Box Girder Bridge


    Beteiligte:
    Wen, Cheng (Autor:in) / Zhang, Hong-xian (Autor:in)


    Erscheinungsdatum :

    2019-06-01


    Format / Umfang :

    72019-01-01 pages




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Unbekannt




    Hoisting construction method for large-cantilever wing-spreading steel box girder

    CHU GENFA / CHANG RENFEI / JIN LIANG et al. | Europäisches Patentamt | 2023

    Freier Zugriff

    Steel truss girder bridge girder transporting flatcar

    ZHENG LIANGFEI / LIU LAN | Europäisches Patentamt | 2020

    Freier Zugriff

    Construction method for assembling bridge girder erection machine through rubber-tyred girder lifter

    LEE DONG WON / CHEN JIZHONG / ZHANG YOUKUN et al. | Europäisches Patentamt | 2024

    Freier Zugriff

    Hoisting equipment for steel box girder bridge construction

    YU YANG / ZHOU PENG / WANG LIHUA | Europäisches Patentamt | 2024

    Freier Zugriff