The procedure of constructing the bored piles of a new bridge is simulated by using the three-dimensional finite element method. The variance of soil body stress, the deformation in each step of the construction, and the stress variance of the existing pile foundation are predicted. The following analysis results are obtained: (1) The construction of a new abutment affects the displacement and structure stress of existing bridge piles; (2) Every step of the construction process affects the displacement of the lower part of the foundation pit; (3) The influence of the first and third steps on the stress of the existing bridge piles is larger compared with other steps; (4) Given the surrounding soil disturbance it causes, the construction of a new pile foundation has little influence on the settlement of existing bridge piles. In view of these findings, the following guidelines are recommended: (1) The first and third steps should be given more attention as they are the key sources of risk; (2) The soil surrounding the existing pile should be reinforced by grouting; (3) Where possible, the strength of the retaining wall structure and brace should be improved; (4) A monitoring and warning system should be created based on information management.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Numerical Simulation of the Influence of Bored Pile Construction on Adjacent Existing Pile Foundation


    Beteiligte:
    Li, Zhi-yan (Autor:in) / Ding, Zhen-ming (Autor:in) / Zhao, Chen (Autor:in)


    Erscheinungsdatum :

    2013-11-15


    Format / Umfang :

    72013-01-01 pages




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch



    Seismic Performance Assessment of Existing Pile Group Foundation

    Luo, X. / Murono, Y. / Tanamura, S. | British Library Online Contents | 2001


    Seismic Performance Assessment of Existing Pile Group Foundation

    Luo, Xiu / Murono, Yoshitaka / Tanamura, Shiro | IuD Bahn | 2001


    Pile foundation overturning construction method and pile foundation overturning adjusting lifting appliance

    WANG KUN / PENG CHANGYANG / XIANG CANLONG et al. | Europäisches Patentamt | 2023

    Freier Zugriff

    Lifting frame for bored pile in limited space

    YU LIMIN / LIU CHANGZHENG / LIU MINGZHONG et al. | Europäisches Patentamt | 2020

    Freier Zugriff

    Pile foundation construction method for dense stratum environment of existing ship dock

    YANG LIANJIAO / ZHAO HUI / XU GUANGLIANG et al. | Europäisches Patentamt | 2020

    Freier Zugriff