A continual challenge for the owners and operators of busy port facilities is conducting maintenance and repairs while keeping Operational and budget impacts to a minimum. Prior to construction, proper attention to scoping, design and construction phasing can increase the likelihood of a smooth bidding process and construction period. This paper describes the pre-construction scoping and design decisions for the rehabilitation of one of the Port of Tacoma's most important intermodal facilities.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Port of Tacoma North Intermodal Yard Rehabilitation


    Beteiligte:

    Kongress:

    Ports Conference 2001 ; 2001 ; Norfolk, Virginia, United States


    Erschienen in:

    Erscheinungsdatum :

    2001-04-27




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    Blair Waterway Widening, Port of Tacoma, Tacoma, Washington

    Bickel, Scott / Fisher, Sally / Kress, Tom et al. | ASCE | 2007


    Port of Tacoma, Washington

    Engineering Index Backfile | 1932


    The ASCE Port and Intermodal Yard Pavement Design Guide

    Smallridge, Mark / Jacob, Ashebir | ASCE | 2001


    The port as intermodal node:models for yard planning and management

    Benacchio, M. / Carnevali, C. / Genova, R. et al. | British Library Conference Proceedings | 1998


    Intermodal Yard Development - Pierce County Terminal

    Bichich, Steven P. / Tomperi, Bryan / Erickson, Brad | ASCE | 2004