Planning Urban Highway Reconstruction with Traffic Demand Affected by Construction Schedule
JOURNAL OF TRANSPORTATION ENGINEERING ; 131 , 10 ; 752-761
01.01.2005
10 pages
Aufsatz (Zeitschrift)
Englisch
DDC: | 629.04 |
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Planning Urban Highway Reconstruction with Traffic Demand Affected by Construction Schedule
Online Contents | 2005
|British Library Conference Proceedings | 2005
|NTIS | 1963
|Urban highway planning liaison
TIBKAT | 1963
|Planning for city highway traffic
Engineering Index Backfile | 1945
|