Real-time pipeline control cuts millions in energy costs, offers safe operation
I AND CS ; 73 ; 61-68
01.01.2000
8 pages
Aufsatz (Zeitschrift)
Englisch
DDC: | 629.8 |
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Multimodal co-operation cuts costs
British Library Conference Proceedings | 1993
|Computer-assisted design cuts costs for pipeline project
Tema Archiv | 1984
|Co-operation cuts life-cycle costs
British Library Online Contents | 2010
|Online Contents | 2010
Mechanical dry seal cuts pipeline compressor maintenance costs, downtime
Tema Archiv | 1985
|