Enterprise Level Software Cost Estimation and Productivity Measurement in Incremental Commitment Model and Model Driven Development (AIAA 2013-5219)
Conference, Infotech@aerospace ; 2013 ; Boston, MA
01.01.2013
2 pages
Includes bibliographical references and index
Aufsatz (Konferenz)
Englisch
Aerospace , Infotech , Astronautics , AIAA , Aeronautics
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Conference Proceedings | 2018
|Time Delayed Incremental Nonlinear Control (AIAA 2013-4929)
British Library Conference Proceedings | 2013
|2011-5219 Spectroscopic Determination of Trace Contaminants in High Purity Oxygen
British Library Conference Proceedings | 2011
|