Analysis of Inducing Joints Behavior during Reservoir Filling in Xiaowan Arch Dam
12th, International Conference on Engineering, Science, Construction, & Operations in Challenging Environments ; 2010 ; Honolulu, HI
2010-01-01
8 pages
Includes bibliographical references
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
A study of reinforcement scheme for xiaowan abutment
British Library Conference Proceedings | 2004
|Smart Monitoring of a Super High Arch Dam during the First Reservoir-Filling Phase
Online Contents | 2017
|Smart Monitoring of a Super High Arch Dam during the First Reservoir-Filling Phase
Online Contents | 2016
|HYDROPOWER AND DAMS IN ASIA - Studies for the transverse joint waterstops at Xiaowan dam
Online Contents | 2006
|