Deep Water FPSO and Subsea Facilities - Installation, Hook-up, and Commissioning in Schiehallion on the UK Atlantic Margin
conference; 31st, Vol 2 pt 2; Platform and marine system design ; 1999 ; Houston; TX
1999-01-01
14 pages
Also known as OTC 99
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Jotun paints for new Schiehallion FPSO
Online Contents | 1997
World's largest FPSO for Schiehallion field
Online Contents | 1996
The Foinaven and Schiehallion Developments
British Library Conference Proceedings | 1996
|The MFB, A Deep Water FPSO with Surface Trees and Drilling Facilities
British Library Conference Proceedings | 1998
|Extensive subsea commissioning, pigging pose challenges
Tema Archiv | 2005
|