Anheizen des mit Kohle geheizten Flammrohrkessels, Aufrüsten der beiden 3fach-Expansion-Dampfmaschinen und Hilfsmaschinen, Auslaufen des Schiffes aus dem Hafen.

    This ship owned by the waterways and shipping department Bremerhaven is shown on its last trips to make bearings on the Aussenweser before laying up. After lay-days, the two triple expansion steam engines (reverse according to Stephenson) with a capacity of each 220 kW (300 H.P.) and the pertinent ancillary machines are made ready for operations during run-up of the coal fired flame tube boiler. The auxiliary drive and the steering gear are also steam driven. Then the ship leaves the Geestevorhafen in Bremerhaven. Based on commands from the bridge to the engine room, given via machine telegraph, the engine room staff carry out the machine manoeuvre. The film shows primarily the work of the machinist and the stokers. The film closes with shots of the boat at work.


    Access

    Go to TIB AV-Portal


    Export, share and cite



    Title :

    Doppelschraubendampfer "Welle", Bremerhaven, 186 BRT, Baujahr 1915 - Tägliche Inbetriebnahme und Auslaufmanöver


    Subtitle :

    Documentation/Report


    Additional title:

    Twin-Screw Steamer "Welle", Bremerhaven, 186 GRT, Year of Construction 1915 - Daily Putting into Operation and Starting


    Contributors:

    Publication date :

    1980-01-01


    Size :

    196MB, 00:20:10:00



    Type of media :

    Audio-visual


    Type of material :

    Audio-visual


    Language :

    German







    Baujahr 1964

    Klauser, Wilhelm | Online Contents | 2006


    Baujahr 1927

    Baus, Ursula | Online Contents | 2006


    Baujahr 1957

    Ballhausen, Nils | Online Contents | 2006



    Preview

    Preview Image