Synonyme wurden verwendet für:
Research
Suche ohne Synonyme:
keywords:(Research)
How did the knowledge of CPV contribute to the standardization activity of VIPV?
Light pipes for CPV: Simulation and measurement of sidewall loss mechanisms
Optical polymer solar concentrators for compact CPV systems
Time delay at photovoltaic parameters determination for high power laser converters
Viisalignments characterization for micro-CPV modules
Molded glass arrays for micro-CPV applications with very good performance
Overview of electrical power models for concentrated photovoltaic systems
Nanostructured surface for extended temperature operating range in concentrator photovoltaic modules
Demonstration of back contacted IIL-V/Ge triple junction solar cells
Massively-parallel microcell arrays and thermal runaway in unilluminated cells
Engineering dislocations and nanovoids for high-efficiency III-V photovoltaic cells on silicon
The New Commercial Suborbital Vehicles: An Opportunity for Scientific and Microgravity Research
Network Capacity - Scheduling II (T1.4.2.1- T1.4.2.6)
Konzeptualisierung und Operationalisierung komplexer Konstrukte
Die bisherige und künftige Paradigmatik des Marketing in Theorie und Praxi
Network Capacity - Network Capacity (T1.2.1.1- T1.2.1.6)
Service Design and Reliability - Rolling Stock I, Carbody, Bogies and Brakes (T2.2.2.1- T2.2.2.6)
Environment as Part of Sustainability - Environmental Strategies (IP3.1-IP3.7)
Service Design and Reliability - Customer / Commercial Service (T2.5.1.1- T2.5.1.4)
Service Design and Reliability - Track Condition Monitoring (T2.3.1.1- T2.3.1.6)
System Optimization - Management of RCF (T3.5.2.1- T3.5.2.6)
Service Design and Reliability - Mobile Broadband / Satellite Communication (T2.9.1.1- T2.9.1.6)
Service Design and Reliability - Train Condition Monitoring (T2.3.3.1- T2.3.3.6)
System Optimization - Pantograph Dynamics (T3.2.2.1- T3.2.2.6)
Environment as Part of Sustainability - Noise and Vibration Control 1 (T6.2.1.1- T6.2.1.6)
Network Capacity - Scheduling I (T1.4.1.1- T1.4.1.4)
Security and Safety - Safety and Security II - General (T4.1.2.1- T4.1.2.6)
Service Design and Reliability - Rolling Stock II, Wheels and Axles (T2.2.3.1- T2.2.3.6)
Security and Safety - Train Control Technology (T4.3.1.1- T4.3.1.6)
System Optimization - International Cooperative Research (T3.7.1.1- T3.7.1.4)
Service Design and Reliability - Track Components (T2.2.1.1- T2.2.1.6)
Service Design and Reliability - Rolling Stock Maintenance and Components (IP2.1- IP2.9)
Security and Safety - Safety and Security I - General (T4.1.1.1- T4.1.1.6)
Human Factors - Human Factors (T5.1.1.1- T5.1.1.6)
Environment as Part of Sustainability - Noise and Vibration Control II (T6.2.2.1- T6.2.2.6)
Environment as Part of Sustainability - Energy Efficiency (T6.3.1.1- T6.3.1.6)
Security and Safety - Crashworthiness Technologies (T4.2.1.1- T4.2.1.6)
Service Design and Reliability - Track Maintenance (T2.1.1.1- T2.1.1.6)