Synonyme wurden verwendet für: feasibility
Suche ohne Synonyme: keywords:(feasibility)

1–20 von 1,883 Ergebnissen
|

    Zwänge aus früheren Genehmigungsverfahren beim Bau des Burgholztunnels

    Austmeyer, H.F. / Mähner, D. | Tema Archiv | 2003
    Schlagwörter: Machbarkeit

    Zinc-air battery and flywheel zero emission vehicle

    F. Tokarz / J. R. Smith / J. Cooper et al. | NTIS | 1995
    Schlagwörter: Feasibility Studies

    X-ray Pulsar/Starlight Doppler Deeply-integrated Navigation Method

    Yidi Wang | Online Contents | 2017
    Schlagwörter: Feasibility studies

    X-43D Conceptual Design and Feasibility Study

    D. B. Johnson / J. S. Robinson | NTIS | 2005
    Schlagwörter: Feasibility studies

    Wind Tunnel Tests of a Free-Wing Tilt-Propeller V/STOL Airplane Model

    T. Strand / E. S. Levinsky | NTIS | 1969
    Schlagwörter: Feasibility studies

    Wind Tunnel Feasibility Study of Aerodynamic Reefing of Subsonic Parachutes

    H. G. Heinrich / R. A. Noreen | NTIS | 1973
    Schlagwörter: Feasibility studies

    Wide Body Aircraft Demand Potential at Washington National Airport

    R. Austrotas / M. Taylor / W. Fromme | NTIS | 1977
    Schlagwörter: Feasibility studies

    What Drives the Battery-Electric-Bus Introduction in Indian Setting: Operators Perspective and Way Forward

    Majumdar, Bandhan Bandhu / Sahu, Prasanta K. / Potoglou, Dimitris | Springer Verlag | 2022
    Schlagwörter: Operational feasibility

    Weapon System 107a-1. Mark 3 Advanced Re-Entry Vehicle Program. Star Tracker

    C. D. Hawn | NTIS | 1961
    Schlagwörter: FEASIBILITY STUDIES

    Water Injection Feasibility for Boeing 747 Aircraft

    D. L. Daggett | NTIS | 2005
    Schlagwörter: Feasibility

    Washington, D.C. Heliport Study

    NTIS | 1984
    Schlagwörter: Feasibility studies

    Washington-Boston Transportation Study. Part B. Feasibility and Cost of Improved Railroad Service

    A. A. Arentz / F. W. Sander / R. E. Pages | NTIS | 1963
    Schlagwörter: Feasibility studies

    Wartime CONUS (Continental United States) Casualty Distribution System Using Dedicated Craf Airlift

    J. P. Alfano / J. C. O'Neill | NTIS | 1985
    Schlagwörter: Feasibility studies

    Warning Monitors for Automatic Landing - a Feasibility Study

    B. D. Armstrong / K. F. Goddard / J. C. Penwill | NTIS | 1968
    Schlagwörter: Feasibility