81–92 von 92 Ergebnissen
|

    Why plasma armature railguns don't work (and what can be done about it)

    Parker, J.V. | Tema Archiv | 1989
    Schlagwörter: CIRCUIT ARRANGEMENT

    Comprehensive luminance control for electroluminescent display monitors

    Tema Archiv | 1986
    Schlagwörter: CIRCUIT ARRANGEMENT

    Multi-conductor model for AC railway train simulation

    Freier Zugriff
    Chen, Yao / White, Roger / Fella, Tony et al. | IET | 2016
    Schlagwörter: AC feeding arrangement

    Simulation and control of a 20-kHz spacecraft power system

    Wasynczuk, O. / Krause, P.C. | Tema Archiv | 1989
    Schlagwörter: SERIES-PARALLEL ARRANGEMENT

    Heating phenomena in the vibrating superconducting magnet on maglev

    Suzuki, E. | Tema Archiv | 1995
    Schlagwörter: folded coil arrangement

    A hierarchical rule-based land use extraction system using geographic and remotely sensed data: A case study for residential uses

    Beykaei, Seyed Ahad / Zhong, Ming / Shiravi, Sajad et al. | Elsevier | 2014
    Schlagwörter: Spatial arrangement analysis

    Train traffic simulation using the longest path method

    Abe, K. / Araya, S. | Tema Archiv | 1986
    Schlagwörter: TRAFFIC ARRANGEMENT

    Fuselage Design

    Sadraey, Mohammad H. | Wiley | 2012
    Schlagwörter: fuselage configuration design and internal arrangement

    SEU sensitivity of power converters with MOSFETs in space

    Brucker, G.J. / Measel, P. / Oberg, P. et al. | Tema Archiv | 1987
    Schlagwörter: PUSH-PULL ARRANGEMENT

    'New technology' magnetic attitude sensors in autonomous underwater vehicle (AUV) applications

    Fowler, J.T. | Tema Archiv | 1990
    Schlagwörter: TRIAXIAL SENSOR ARRANGEMENT

    The growth of GaSb under microgravity conditions

    Lendvay, E. / Harsy, M. / Gorog, T. et al. | Tema Archiv | 1985
    Schlagwörter: BRIDGEMAN TYPE ARRANGEMENT

    PPP in Greenfield Airport Development: A Case Study of Cochin International Airport Limited

    Rajan, Thillai A. / Sharad, Sheetal / Sinha, Sidharth | Wiley | 2008
    Schlagwörter: privately funded infrastructure projects and BOT (build, operate, transfer) type of arrangement