1–10 von 51 Ergebnissen
|

    Railway Capacity Calculation in Emergency Using Modified Fuzzy Random Optimization Methodology

    Wang, Li / An, Min / Jia, Limin et al. | Springer Verlag | 2020
    Beteiligte: Jia, Limin , An, Min

    Railway Capacity Calculation in Emergency Using Modified Fuzzy Random Optimization Methodology

    Wang, Li / An, Min / Jia, Limin et al. | TIBKAT | 2020

      Railway Capacity Calculation in Emergency Using Modified Fuzzy Random Optimization Methodology

      Wang, Li / An, Min / Jia, Limin et al. | British Library Conference Proceedings | 2020

    High-Speed Railway Timetable Rescheduling Method: A Bi-level Integrated Programming Approach

    Zhang, Huiru / Jia, Limin / Wang, Li et al. | British Library Conference Proceedings | 2018

    Failure Analysis of Metro Door System Based on Fuzzy TOPSIS

    Cheng, Xiao-qing / Qin, Yong / Jia, Li-min et al. | Springer Verlag | 2017

    Failure Propagation Analysis of Complex System Based on Multiple Potential Field

    Fu, Yong / Qin, Yong / Kou, Lin-Lin et al. | Springer Verlag | 2020

    The Prediction of Derailment Coefficient Using NARX Neural Network

    Pang, Xue-Miao / Qin, Yong / Xing, Zong-Yi et al. | ASCE | 2011

    Railway Track Quality Assessment Method Based on Mechanism Modeling

    Qin, Yong / Wei, Wei / Xing, Zong-yi et al. | ASCE | 2011