Shuttle/Agena Study. Volume 2, Part 1 Program Requirements, Conclusions, Recommendations
Study of Solid Rocket Motor for Space Shuttle Booster, Volume 3: Program Acquisition Planning
Analysis of Advanced Programs (Study 2.3). Volume 1 Executive Summary
APOLLO Experience Report Real-Time Auxiliary Computing Facility Development
The APOLLO Spacecraft: A Chronology. Volume 2: 8 November 1962 - 30 September 1964
Systems Design Study of the Pioneer Venus Spacecraft. Volume 3. Specifications
System Design of the Pioneer Venus Spacecraft. Volume 12: International Cooperation
The Space Shuttle Payload Planning Working Groups. Volume 10: Space Technology
Design Study of RL10 Derivatives. Volume 3, Part 2: Operational and Flight Support Plan