1–20 von 30 Ergebnissen
|

Ihre Suche:
keywords:(target)

    Durability Assessment Based on Design-value Method for Structure Design

    Yao, Jitao / Gu, Hui | Online Contents | 2018
    Schlagwörter: target reliability index

    Developing an active resource allocation algorithm considering resource supply and demand in a construction site

    Kang, Leen-Seok / Moon, Hyoun-Seok / Min, Chang-Hoon et al. | Online Contents | 2015
    Schlagwörter: target resource profile

    Determination of Optimal Load-Resistance Factors for Gravitational Loads-Governed Limit State of Korean Bridge Design Code

    Lee, Hae Sung / Song, Sang Won / Kim, Ji Hyeon | Online Contents | 2019
    Schlagwörter: target strength , target reliability index

    The Effect of Partial Transparency of Spherical Targets on TLS Point Clouds Registration Accuracy

    Lenda, Grzegorz / Marmol, Urszula / Buczek, Michał | Online Contents | 2018
    Schlagwörter: spherical target

    A heuristic-based population synthesis method for micro-simulation in transportation

    Zhuge, Chengxiang / Li, Xia / Ku, Chia-An et al. | Online Contents | 2017
    Schlagwörter: target marginal distribution

    CIMAC and MTZ Industriala Meeting of Minds

    Itoh, Yasuhiro | Online Contents | 2011
    Schlagwörter: Target Readership

    A lane level positioning-based cooperative vehicle conflict resolution algorithm for unsignalized intersection collisions

    Liu, Jiang / Cai, Baigen / Wang, Yunpeng et al. | Tema Archiv | 2013
    Schlagwörter: target acceleration

    Zielkostenplanung - Target Costing in der Wohnungswirtschaft

    Heß, Jens-Uwe / Boenert, Lothar / Blecken, Udo | IuD Bahn | 2002
    Schlagwörter: Target Costing

    Design and Research of a Microgravity Floating Target Satellite System

    Zhang, Xia / Feng, Yong-Ke | Tema Archiv | 2012
    Schlagwörter: target satellite

    Aufgaben und Instrumente des Gemeinkostenmanagement

    Striening, Hans-Dieter | IuD Bahn | 1996
    Schlagwörter: Target Costing

    Statt Streichkonzert

    Proaktive Management-Konzeptionen verbessern nachhaltig die Kostenposition
    Kajüter, Peter | IuD Bahn | 1996
    Schlagwörter: Target Costing

    Simplified multimodal pushover target acceleration method for seismic resistance analysis of medium-rise RC structures

    Balic, Ivan / Trogrlic, Boris / Mihanovic, Ante | Online Contents | 2017
    Schlagwörter: target acceleration

    Reliability Assessment of Geotechnical Structures on Soils improved by Deep Mixing Method II: Reliability Analyses and Estimation of Target Reliability Index

    Jo, Young-Seok / Park, Joon-Mo / Jang, Yeon-Soo | Online Contents | 2019
    Schlagwörter: target reliability index

    Kundenanforderungen als Determinante des Kostenmanagements komplexer Produkte

    Rösler, Frank | IuD Bahn | 1995
    Schlagwörter: Target Costing

    Modelling debris and shrapnel generation in inertial confinement fusion experiments

    Eder, D.C. / Fisher, A.C. / Koniges, A.E. et al. | Tema Archiv | 2013
    Schlagwörter: cryogenic target

    Thermal Hydraulic Analysis of Lithium Jet with Incident Beam

    Hassanein, A. / Japan Atomic Energy Research Institute | British Library Conference Proceedings | 1995
    Schlagwörter: lithium target system

    Kostengerechte Produktentwicklung

    Target Costing und Wertanalyse im Vergleich
    Bullinger, Hans-Jörg / Warschat, Joachim / Frech, Joachim | IuD Bahn | 1994
    Schlagwörter: Target Costing

    Wind Pressure Statistics and Target Reliability Index for Wind Load-governed Limit State of Reliability-based Bridge Design Codes

    Lee, Hae Sung / Kim, Ji Hyeon | Online Contents | 2019
    Schlagwörter: target reliability index