1–20 von 4,983 Ergebnissen
|

    2.4 Acoustics

    Allen, Christopher S. | NTRS | 2016

    2D axisymmetric analysis of SRM ignition transient

    Bai, S. D. / Han, Samuel S. / Pardue, B. A. | NTRS | 1993

    2-D Circulation Control Airfoil Benchmark Experiments Intended for CFD Code Validation

    Englar, Robert J. / Jones, Gregory S. / Allan, Brian G. et al. | NTRS | 2009

    2MASS Near-Infrared Imaging of IC443

    Rho, J. / Van Dyk, S. / Jarrett, T. et al. | NTRS | 1999

    2nd GSFC-JPL Quality Mission Workshop Report

    Lin, C. / Doyle, R. / Green, S. et al. | NTRS | 2000

    25-LBF GO2/GH2 space station thruster

    Finden, L. E. / Briley, G. L. / Iacabucci, R. S. | NTRS | 1988

    30 x 60 foot wind tunnel test highlights for an over-the-tail advanced turboprop configuration

    Coe, Paul L., Jr. / Perkins, John N. / Rhodes, Graham S. | NTRS | 1991

    200 Gbps TBIRD CubeSat Downlink: Pre-Flight Test Results

    Curt M Schieler / Kathleen M Riesing / Andrew J Horvath et al. | NTRS

    2001 Mars Odyssey Mission

    Saunders, R. S. | NTRS | 2002

      2001 Mars Odyssey Mission

      Saunders, R. S. | NTRS | 2002

    2001 Mars Odyssey orbit determination during interplanetary cruise

    Antreasian, P. G. / Baird, D. T. / Border, J. S. et al. | NTRS | 2002

      2001 Mars Odyssey orbit determination during interplanetary cruise

      Antreasian, P. G. / Baird, D. T. / Border, J. S. et al. | NTRS | 2002

    2001 Mars Odyssey Project report

    Spencer, D. A. / Gibbs, R. G. / Mase, R. A. et al. | NTRS | 2002

    2001 Mars Odyssey project report

    Landano, M. R. / Gibbs, R. G. / Spencer, D. A. et al. | NTRS | 2002

    2003 Information Managers' Workshop

    Chandler, R. T. / Pateracki, S. | NTRS | 2003