1–7 von 7 Ergebnissen
|

    Unascertained measure model of water and mud inrush risk evaluation in karst tunnels and its engineering application

    Li, S. C. / Wu, J. / Xu, Z. H. et al. | Springer Verlag | 2016

    Probabilistic Fuzzy Logic Signal and Ramp Metering at a Diamond Interchange

    Fang, F. C | Online Contents | 2015
    Beteiligte: Xu, W. L

    Probabilistic Fuzzy Logic Signal and Ramp Metering at a Diamond Interchange

    V C Pham | Online Contents | 2015
    Beteiligte: W L Xu

    Probabilistic Fuzzy Logic Signal and Ramp Metering at a Diamond Interchange

    Pham, V. C. / Xu, W. L. / Alam, F. et al. | ASCE | 2014

    Incorporating hysteresis in one-dimensional seepage modeling in unsaturated soils

    Wu, L. Z. / Huang, R. Q. / Xu, Q. | Springer Verlag | 2011

      Incorporating hysteresis in one-dimensional seepage modeling in unsaturated soils

      Wu, L. Z. / Huang, R. Q. / Xu, Q. | Online Contents | 2012

    Modeling tire/road contact using piecewise Ritz procedure

    Xu,Y. / Jia,L. / Zhang,J. et al. | Kraftfahrwesen | 2005

    Incorporating inflow uncertainty into risk assessment for reservoir operation

    Xu, Z. X. / Ito, K. / Liao, S. et al. | British Library Online Contents | 1997