1–20 von 575 Ergebnissen
|

    The Brooklyn Navy Yard. A Plan for Redevelopment

    NTIS | 1968
    Schlagwörter: Civil Engineering , Marine Engineering , Industrial training , Industrial production , Area planning and development

    Systems Analysis of Urban Transportation. Volume 4. Supporting Analyses

    NTIS | 1968
    Schlagwörter: Civil Engineering , Industrial training , Management engineering , Area planning and development

    Airport Environs Plan, Jackson, Tennessee

    NTIS | 1973
    Schlagwörter: Civil Engineering , Manufacturing , Industrial parks

    Qualification testing of General Electric 50 Ah nickel-cadmium cells with new separator and new positive-plate processing

    Morrow, G.W. | Tema Archiv | 1986
    Schlagwörter: NASA (NATIONAL AERONAUTICS AND SPACE ADMINISTRATION) , FERTIGUNGSVERFAHREN

    Development of an expert investment strategy system for aerospace RD&E and production contract bidding

    Madey, G.R. / Wolfe, M.H. / Potter, J. | Tema Archiv | 1987
    Schlagwörter: AEROSPACE RESEARCH AND DEVELOPMENT ENGINEERING , PRODUCTION CONTRACT BIDDING , ENGINEERING MANAGEMENT

    Representing parts hierarchies for expert systems in engineering project management

    Kuczora, P.W. | Tema Archiv | 1990
    Schlagwörter: ENGINEERING STRUCTURES , ENGINEERING PROJECT MANAGEMENT , MASTER PRODUCTION SCHEDULE , INDUSTRIAL COLLABORATOR

    Dokumentation: Verkehr gestalten! : ein Experten- und Projektforum [3. und 4. Mai 1994 im Design Center Stuttgart]

    Design Center Stuttgart | TIBKAT | 1994
    Schlagwörter: Industrial design , Traffic engineering , Communication and traffic

    Analyse der technischen Effizienz in Nordrhein-Westfalen : Messung, Ursachen und wirtschaftspolitische Konsequenzen

    Wolf, Michael | SLUB | 1994
    Schlagwörter: Produktion , Technik , Industrial productivity

    A dynamic, realtime approach to long duration manufacturing schedule monitoring and control

    Koonce, D.A. / Parks, C.M. / Keys, L.K. | Tema Archiv | 1994
    Schlagwörter: long duration manufacturing schedule monitoring and control , artificial intelligence knowledge representation technique

    A spreadsheet approach to minimum cost tolerancing for rocket engines

    Gerth, R.J. | Tema Archiv | 1994
    Schlagwörter: NASA (National Aeronautics and Space Administration) , manufacturing difficulty curves , concurrent engineering environment

    Konzepte der Musealisierung von Technik und Arbeit : museale Erschließung - Perspektive für das Industriedenkmal Saline Luisenhall

    Steinert, Arne | TIBKAT | 1997
    Schlagwörter: Industrial museums , Verfahrenstechnik

      Konzepte der Musealisierung von Technik und Arbeit : museale Erschließung - Perspektive für das Industriedenkmal Saline Luisenhall

      Steinert, Arne | GWLB - Gottfried Wilhelm Leibniz Bibliothek | 1997
      Schlagwörter: Industrial museums , Verfahrenstechnik

    One best way? : trajectories and industrial models of the world's automobile producers

    Freyssenet, Michel | TIBKAT | 1998
    Schlagwörter: Automobile industry and trade , Industrial Engineering , Design and construction , Industrial engineering

    Effects of the vertical loading on the bridge structure converted into continuous spans through the “No-Joint” Method

    Park, Jong-Jin / Cho, Hyun-Yung / Cheung, Jin-Hwan | Springer Verlag | 1998
    Schlagwörter: No-Joint method and durability , Engineering , Civil Engineering , Industrial Pollution Prevention , Geotechnical Engineering & Applied Earth Sciences

    Prediction of shoreline change behind detached breakwater

    Lee, Cheol-Eung | Springer Verlag | 1998
    Schlagwörter: Engineering , Civil Engineering , Industrial Pollution Prevention , Automotive and Aerospace Engineering, Traffic , Geotechnical Engineering

    Elastic buckling of orthotropic open section compression members with edge stiffeners

    Jeong, Sang Kyoon / Yoon, Soon Jong | Springer Verlag | 1998
    Schlagwörter: Engineering , Civil Engineering , Industrial Pollution Prevention , Automotive and Aerospace Engineering, Traffic , Geotechnical Engineering

    Influence of group-bounded long wave on sediment transport rate

    Lee, Cheol-Eung | Springer Verlag | 1998
    Schlagwörter: Engineering , Civil Engineering , Industrial Pollution Prevention , Automotive and Aerospace Engineering, Traffic , Geotechnical Engineering

    Knowledge acquisition and representation model for developing an expert system for pavement maintenance and REhabilitation strategy in the State of Ohio (ESPRESSO)

    Wee, Seong-Dong | Springer Verlag | 1998
    Schlagwörter: pavement maintenance and rehabilitation , Engineering , Civil Engineering , Industrial Pollution Prevention , Geotechnical Engineering & Applied Earth Sciences

    Three-dimensional homogenized crack model for tensile fracture of concrete

    Lee, Jun S. / Choi, Il-Yoon / Bang, Choon-suk et al. | Springer Verlag | 1999
    Schlagwörter: Engineering , Civil Engineering , Industrial Pollution Prevention , Automotive and Aerospace Engineering, Traffic , Geotechnical Engineering

    Back analysis for prediction and behavior of laterally loaded single piles in sand

    Kim, Byung-Tak / Kim, Young-Su | Springer Verlag | 1999
    Schlagwörter: Engineering , Civil Engineering , Industrial Pollution Prevention , Automotive and Aerospace Engineering, Traffic , Geotechnical Engineering

    Effect of aggregation on chaotic time series

    Kim, Hung Soo / Yoon, Yong Nam / Yi, Gyu-Sei et al. | Springer Verlag | 2000
    Schlagwörter: Engineering , Civil Engineering , Industrial Pollution Prevention , Automotive and Aerospace Engineering, Traffic , Geotechnical Engineering