Synonyme wurden verwendet für: Bergbau
Suche ohne Synonyme: keywords:(Bergbau)

1–20 von 41 Ergebnissen
|

    Development of a three-phase variable speed drive system for a battery fed underground mining locomotive

    Prest, R.B. / Wyk, J.D. van / Schultz, J. | Tema Archiv | 1988
    Schlagwörter: BERGBAU , BATTERY FED UNDERGROUND MINING LOCOMOTIVE

    Inductance calculations for earth-return trolley systems

    Tylavsky, D.J. / Kulkarmi, A.Y. | Tema Archiv | 1988
    Schlagwörter: BERGBAU

    Test results of a precise, short range, RF navigational/positional system

    Palmer, R.J. | Tema Archiv | 1989
    Schlagwörter: BERGBAU

    Vehicle control of unmanned dump trucks

    Okawa, Y. / Nagai, T. / Murayama, O. et al. | Tema Archiv | 1992
    Schlagwörter: Bergbau

    Application of downhole video technology to multilateral well completions

    Maddox, S. | Tema Archiv | 1997
    Schlagwörter: Tiefbohren (Bergbau)

    Experiments in autonomous underground guidance

    Scheding, S. / Nebot, E.M. / Stevens, M. et al. | Tema Archiv | 1997
    Schlagwörter: Bergbau

    Linear synchronous motor hoists

    Cruise, R.J. / Landy, C.F. | Tema Archiv | 1997
    Schlagwörter: Bergbau

    Pratical experiences in Europe with hydro dynamic horizontal directional drilling systems

    Rameil, M. | Tema Archiv | 1997
    Schlagwörter: Bohren (Bergbau)

    Development of an internal coiled tubing connector utilizing permanent packer technology

    Coronado, M.P. | Tema Archiv | 1998
    Schlagwörter: Bohrung (Bergbau)

    Horizontal well performance evaluation tools and techniques

    Kuchuk, F.J. / Lenn, C. / Hook, P. et al. | Tema Archiv | 1998
    Schlagwörter: Bohrung (Bergbau)

    Product specific design and development software

    Smith, C.B. | Tema Archiv | 1999
    Schlagwörter: Tiefbohren (Bergbau)

    Advanced sand control completion with permanent monitoring

    McKay, G. / Bixenman, P.W. / Watson, G. | Tema Archiv | 2000
    Schlagwörter: Bohren (Bergbau)

    Downhole video: a cost/benefit analysis

    Tague, J.R. / Hollman, G.F. | Tema Archiv | 2000
    Schlagwörter: Bohren (Bergbau)

    Increased productivity with AC drives for mining excavators and haul trucks

    Brown, G.M. / Elbacher, B.J. / Koellner, W.G. | Tema Archiv | 2000
    Schlagwörter: Bergbau

    Real-time well construction monitoring - A case history of Sincor's heavy oil project

    Branch, A.J. / Andersen, K. / Lavillonniere, J.L. et al. | Tema Archiv | 2001
    Schlagwörter: Bohren (Bergbau)

    Designing underbalanced thru tubing drilling operations

    Nas, S. / Laird, A. | Tema Archiv | 2001
    Schlagwörter: Bohren (Bergbau)

    The detection of explosives using robotic crawlers

    Arrieta, R.T. | Tema Archiv | 2003
    Schlagwörter: Bergbau