1–14 von 14 Ergebnissen
|

    Principal Stress Rotation under Bidirectional Simple Shear Loadings

    Li, Yao / Yang, Yunming / Yu, Hai-Sui et al. | Springer Verlag | 2017

      Principal Stress Rotation under Bidirectional Simple Shear Loadings

      Li, Yao / Yang, Yunming / Yu, Hai-Sui et al. | Online Contents | 2018

    Erratum to: Principal Stress Rotation under Bidirectional Simple Shear Loadings

    Freier Zugriff
    Li, Yao / Yang, Yunming / Yu, Hai-Sui et al. | Springer Verlag | 2017

      Erratum to: Principal Stress Rotation under Bidirectional Simple Shear Loadings

      Li, Yao / Yang, Yunming / Yu, Hai-Sui et al. | Online Contents | 2019

    Forward Modelling and GPR Imaging in Leakage Detection and Grouting Evaluation in Tunnel Lining

    Lin, Chunjin / Wang, Xintong / Li, Yao et al. | Springer Verlag | 2020

    Failure Mechanisms and Modes of Tunnels in Monoclinic and Soft-Hard Interbedded Rocks: A Case Study

    Chen, Jianxun / Liu, Weiwei / Chen, Lijun et al. | Springer Verlag | 2020

    Rotary table and engineering machinery

    Freier Zugriff
    WU DAXIN / SHE LINGJUAN / LI YAO et al. | Europäisches Patentamt | 2015

    Method for transporting steel columns under trestle

    Freier Zugriff
    LI XIANGDONG / LI YAO / BIAN XIAOLIANG et al. | Europäisches Patentamt | 2020

    A criteria-based approach for selecting touring paths using GIS & GA

    Li Yao, / Bo Huang, / Der-Horng Lee, | IEEE | 2003

    Performance of Tunnel Feet-Lock Pipe (TFP) in Sharing Vertical Foundation Load

    Chen, Lijun / Chen, Jianxun / Li, Yao et al. | Springer Verlag | 2021

    Double-rocker-arm derrick rotation supporting mechanism capable of being transported and installed in split mode

    Freier Zugriff
    WANG MENG / JIA JIANCHUN / JIN LONG et al. | Europäisches Patentamt | 2023

    Trolley for renovating tunnel defects

    Freier Zugriff
    MA WEIBIN / GUO XIAOXIONG / FU BINGXIAN et al. | Europäisches Patentamt | 2020