Meinten Sie:
+keyword:(correction)
Dozer Productivity Correction Method for Eco-Dozing Assessment
Evaluation of the undrained shear strength of Busan clay
Forecasting Model of Construction Cost Index Based on VECM with Search Query
Joint Modelling of Drought Severity and Duration using Copula Theory: A Case Study of Ghana
Application of Self-adaptive Vision-Correction Algorithm for Water-Distribution Problem
Efficiency Analysis of Filter-Based Calibration Technique to Improve Tunnel Measurement Reliability
Analysis on the applicability of simulated image from SPOT 4 HRVIR image
Time Series Analysis Framework for Forecasting the Construction Labor Costs
Heterogeneous Route Choice Model Incorporating Group Segmentation Based on Travel Experience
Numerical Simulation for Synergetic Deformation of Optical Fiber Sensor and Asphalt Mixture
Performance test of high resolution schemes for 1D dam break problem