Synonyme wurden verwendet für: Cost Optimisation
Suche ohne Synonyme: keywords:("Cost Optimisation")

1–20 von 22 Ergebnissen
|

    An analysis of the development of the tramway/light rail concept in the british Isles

    Souter, I.A. | Tema Archiv | 2001
    Schlagwörter: Kostenoptimierung

    Application builder: A method for building application software for caterpillar electronic engines

    Moore-McKee, A.L. | Tema Archiv | 1994
    Schlagwörter: Kostenoptimierung

    Baggern im Emder Fahrwasser. Ein neues Konzept

    Meesenburg, S. / Meyer, H. / Becker, D. | Tema Archiv | 1999
    Schlagwörter: Kostenoptimierung

    Der begehbare Infrastrukturkanal. Ein altes Thema für einen neuen Anfang?

    Jodl, H.G. | Tema Archiv | 1996
    Schlagwörter: Kostenoptimierung

    Diverless subsea flange connection

    West, A. / Giles, J. / Gibson, D. | Tema Archiv | 1999
    Schlagwörter: Kostenoptimierung

    Engineering cost analysis of the urban tracked air cushion vehicle system

    Hitz, J.S. | Tema Archiv | 1972
    Schlagwörter: KOSTENOPTIMIERUNG

    Entwicklungsstand der Controllingpraxis in der Versorgungswirtschaft

    Bozem, K. | Tema Archiv | 1995
    Schlagwörter: Kostenoptimierung

    Fire proof engine room

    Häkkinen, P. | Tema Archiv | 1997
    Schlagwörter: Kostenoptimierung

    Gesichtspunkte fuer die Auswahl erdverlegter Rohre und Rohrleitungsteile aus betrieblicher Sicht

    Kottmann, A. | Tema Archiv | 1985
    Schlagwörter: KOSTENOPTIMIERUNG

    Glass shapes our future

    Vitkala, Jorma | Tema Archiv | 2004
    Schlagwörter: Kostenoptimierung

    Multilevel optimization applied to hull girder design using three panel forms

    Rahman, M.K. | Tema Archiv | 1994
    Schlagwörter: Kostenoptimierung

    Multi-project Time-cost Optimization in Critical Chain with Resource Constraints

    Taheri Amiri, Mohammad Javad / Haghighi, FarshidReza / Eshtehardian, Ehsan et al. | Springer Verlag | 2018
    Schlagwörter: bi-objective time-cost optimization

      Multi-project Time-cost Optimization in Critical Chain with Resource Constraints

      Taheri Amiri, Mohammad Javad / Haghighi, FarshidReza / Eshtehardian, Ehsan et al. | Online Contents | 2018
      Schlagwörter: bi-objective time-cost optimization

    Optimal seismic design of Reinforced Concrete shear wall-frame structures

    Kaveh, Ali / Zakian, Pooya | Springer Verlag | 2014
    Schlagwörter: discrete structural cost optimization

      Optimal seismic design of Reinforced Concrete shear wall-frame structures

      Kaveh, Ali / Zakian, Pooya | Online Contents | 2014
      Schlagwörter: discrete structural cost optimization

    Optimizing of Discrete Time-Cost in Construction Projects Using New Adaptive Weight Formulations

    Toğan, Vedat / Berberoğlu, Neslihan / Dede, Tayfun | Springer Verlag | 2022
    Schlagwörter: Time-cost optimization

    Optimum cost design of steel box-girder by varying plate thickness

    Thang, Do Dai / Koo, Min-Se / Hameed, Asif | Springer Verlag | 2009
    Schlagwörter: cost optimization

    Structural damage identification using assigned partial eigenstructure

    Cobb, R.G. / Liebst, B.S. | Tema Archiv | 1997
    Schlagwörter: Kostenoptimierung

    Technische und kostenmäßige Optimierung der Verlegung von Verteil- und Hausanschlußleitungen für Gas und Wasser

    Bächle, A. / Rischmüller, R. | Tema Archiv | 1996
    Schlagwörter: Kostenoptimierung