Synonyme wurden verwendet für: Risikoanalyse
Suche ohne Synonyme: keywords:("Risikoanalyse")

1–20 von 32 Ergebnissen
|

    Improved Probabilistic Modeling of Wind Speed in the Context of Structural Risk Assessment

    Qin, Jianjun | Online Contents | 2018
    Schlagwörter: risk assessment

    Probabilistic Risk Assessment of unsaturated Slope Failure Considering Spatial Variability of Hydraulic Parameters

    Wang, Lin / Wu, Chongzhi / Li, Yongqin et al. | Online Contents | 2019
    Schlagwörter: risk assessment

    Landslide Risk Assessment by using a New Combination Model based on a Fuzzy Inference System Method

    Azimi, S. Reza / Nikraz, Hamid / Yazdani-Chamzini, Abdolreza | Online Contents | 2018
    Schlagwörter: landslide risk assessment

    Construction project risk assessment by using adaptive-network-based fuzzy inference system: An empirical study

    Ebrat, Mehdi / Ghodsi, Reza | Online Contents | 2014
    Schlagwörter: risk assessment

    An Improved Extension System for Assessing Risk of Water Inrush in Tunnels in Carbonate Karst Terrain

    Zhang, Kai / Zheng, Wenbo / Xu, Cong et al. | Online Contents | 2019
    Schlagwörter: risk assessment

    Probabilistic seismic hazard analyses and obtaining uniform hazard spectra of Tabriz, Iran

    Razeghi, H. R. / Ghodrati Amiri, G. / Razavian Amrei, S. A. et al. | Online Contents | 2016
    Schlagwörter: seismic hazard analysis

    Project risk assessment model combining the fuzzy weighted average principle with a similarity measure

    Rezakhani, Pejman / Jang, Won-Suk / Lee, Sangwook et al. | Online Contents | 2014
    Schlagwörter: fuzzy risk assessment

    Risk Assessment Model for Water and Mud Inrush in Deep and Long Tunnels Based on Normal Grey Cloud Clustering Method

    Li, Tian-zheng / Yang, Xiao-li | Online Contents | 2018
    Schlagwörter: risk assessment model

    A Data-driven Approach to Estimate the Probability of Pedestrian Flow Congestion at Transportation Bottlenecks

    Wang, Jinghong / Chen, Manman / Yan, Wenyu et al. | Online Contents | 2019
    Schlagwörter: risk assessment

    Schedule Risk Analysis using a Proposed Modified Variance and Mean of the Original Program Evaluation and Review Technique Model

    Sackey, Solomon / Kim, Byung-Soo | Online Contents | 2019
    Schlagwörter: schedule risk analysis

    Seismic hazard maps based on the intensity measure INp

    Chávez, Robespierre / Bojórquez, Edén | Online Contents | 2018
    Schlagwörter: probabilistic seismic hazard analysis

    The development of a web-based construction safety management information system to improve risk assessment

    Park, Jongkeun / Park, Seunghee / Oh, Taekeun | Online Contents | 2015
    Schlagwörter: risk assessment

    The probability distribution of project completion times in simulation-based scheduling

    Lee, Dong-Eun / Arditi, David / Son, Chang-Baek | Online Contents | 2013
    Schlagwörter: project risk analysis

    Damage potential and vulnerability functions of strategic buildings in the city of Algiers

    Remki, Mustapha / Benouar, Djillali | Online Contents | 2014
    Schlagwörter: risk analysis

    USGS hazard map compatible depth-dependent seismic site coefficients for the Upper Mississippi Embayment

    Moon, Sung-woo / Hashash, Youssef M. A. / Park, Duhee | Online Contents | 2017
    Schlagwörter: probabilistic seismic hazard analysis

    The computer-based contingency estimation through analysis cost overrun risk of public construction project

    Jung, Ji Hyun / Kim, Dae Young / Lee, Hak Ki | Online Contents | 2016
    Schlagwörter: risk analysis

    Predicting Collision Risk between Trucks and Interstate Overpasses

    Xiao Qin | Online Contents | 2016
    Schlagwörter: Risk assessment

    Development and Implementation of a Lifecycle Carbon Tool for Highway Maintenance

    E Itoya | Online Contents | 2015
    Schlagwörter: Risk assessment

    Probabilistic Risk Assessment of RCC Dam Considering Grey-Stochastic-Fuzzy Uncertainty

    Chen, Wenlong / Wang, Xiaoling / Liu, Minghui et al. | Online Contents | 2018
    Schlagwörter: probabilistic risk assessment