1–7 von 7 Ergebnissen
|

    Data envelopment analysis based efficiency measurement of engineering change controlling for infrastructure construction under integrated project delivery mode

    Freier Zugriff
    Zhang, Yinglong / Hu, Hao | IET | 2020
    Schlagwörter: infrastructure construction projects , construction industry , complex construction technology , long construction period

    Research on the influence factors of real driving cycle with statistical analysis and dynamic time warping

    Freier Zugriff
    Yu, Shu / Lü, Lin | IET | 2018
    Schlagwörter: RDC construction process

    Fault diagnosis approach of traction transformers in high-speed railway combining kernel principal component analysis with random forest

    Freier Zugriff
    Dai, Chenxi / Liu, Zhigang / Hu, Keting et al. | IET | 2016
    Schlagwörter: classifier construction

    Projected state-wide traffic forecast parameters using artificial neural networks

    Freier Zugriff
    Ghanim, Mohammad S. / Abu-Lebdeh, Ghassan | IET | 2019
    Schlagwörter: adjacent construction activities

    Short-term passenger flow forecast of urban rail transit based on GPR and KRR

    Freier Zugriff
    Guo, Zhiqiang / Zhao, Xin / Chen, Yaxin et al. | IET | 2019
    Schlagwörter: construction

    Robust multi-objective vehicle routing problem with time windows for hazardous materials transportation

    Freier Zugriff
    Men, Jinkun / Jiang, Peng / Xu, Huan et al. | IET | 2020
    Schlagwörter: initial population construction

    Mining the spatio-temporal pattern using matrix factorisation: a case study of traffic flow

    Freier Zugriff
    Xu, Chenyang / Xu, Changqing / Truong, Trieu-Kien | IET | 2020
    Schlagwörter: road construction