Synonyme wurden verwendet für: performance
Suche ohne Synonyme: keywords:(Schedule performance)

1–20 von 39 Ergebnissen
|

    The limitation of machine-learning based models in predicting airline flight block time

    Abdelghany, Ahmed / Guzhva, Vitaly S. / Abdelghany, Khaled | Elsevier | 2022
    Schlagwörter: Airline schedule , On-time performance , Schedule reliability

    Airline schedule padding and consumer choice behavior

    Yimga, Jules / Gorjidooz, Javad | Elsevier | 2019
    Schlagwörter: Schedule padding , On-time performance

    Are on-time performance statistics worthless? An empirical study of the flight scheduling strategies of Brazilian airlines

    Eufrásio, Ana Beatriz R. / Eller, Rogéria A.G. / Oliveira, Alessandro V.M. | Elsevier | 2020
    Schlagwörter: Schedule padding , On-time performance

    Airport Operational Performance and Its Impact on Airline Cost

    Hansen, Mark / Zou, Bo | Wiley | 2013
    Schlagwörter: Airport Operational Performance , Schedule Buffer

    Multi-parameter predictive shift schedule of automatic mechanical transmission for electric bus

    Peng, Jiankun / Zhang, Hailong / Li, Haonan et al. | SAGE Publications | 2022
    Schlagwörter: shift schedule , dynamic performance

    Air Traffic Flow Management slot allocation to minimize propagated delay and improve airport slot adherence

    Ivanov, Nikola / Netjasov, Fedja / Jovanović, Radosav et al. | Elsevier | 2016
    Schlagwörter: Schedule buffer , Performance targets

    Bunching and Headway Adherence Approach to Public Transport with GPS

    Byon, Young-Ji / Cortés, Cristián E. / Jeong, Young-Seon et al. | Springer Verlag | 2017
    Schlagwörter: Transit performance , Transit schedule

    Improving schedule reliability based on copulas: An application to five of the most congested US airports

    Diana, Tony | Elsevier | 2011
    Schlagwörter: Airline schedule reliability , On-time airline performance

    A global model for estimating the block time of commercial passenger aircraft

    Coy, Steven | Elsevier | 2006
    Schlagwörter: Airline on-time performance , Airline schedule construction

    Accuracy of Schedule Performance Calculation with ES Method and EV Method

    Kristiandi, Cangga / Anondho, Basuki | Springer Verlag | 2022
    Schlagwörter: Schedule performance , Earned schedule

    Potential of integrated flight scheduling and rotation planning considering aerodynamic-, engine- and mass-related aircraft deterioration

    Lindner, M. / Rosenow, J. / Förster, S. et al. | Online Contents | 2018
    Schlagwörter: Performance deviation factors , Flight schedule optimization

    Inherent delays and operational reliability of airline schedules

    Wu, Cheng-Lung | Elsevier | 2005
    Schlagwörter: Schedule reliability , On-time performance

    Historical Mass, Power, Schedule, and Cost Growth for NASA Spacecraft

    Hayhurst, Marc R. / Bitten, Robert E. / Shinn, Stephen A. et al. | NTRS | 2016
    Schlagwörter: Spacecraft Design, Testing And Performance , Schedule

    Potential of integrated flight scheduling and rotation planning considering aerodynamic-, engine- and mass-related aircraft deterioration

    Lindner, M. / Rosenow, J. / Förster, S. et al. | Springer Verlag | 2018
    Schlagwörter: Flight schedule optimization , Performance deviation factors

    Assessment of Risk Impact on Road Project Using Deep Neural Network

    Isah, Muritala Adebayo / Kim, Byung-Soo | Springer Verlag | 2022
    Schlagwörter: Schedule performance , Cost performance

    Duration Estimate at Completion: Improving Earned Value Management Forecasting Accuracy

    Sackey, Solomon / Lee, Dong-Eun / Kim, Byung-Soo | Springer Verlag | 2020
    Schlagwörter: Performance measurement , Earned schedule

    Forecasting Airport Delays

    Chin, David K. / Meilus, Alius J. / Murphy, Daniel et al. | Wiley | 2013
    Schlagwörter: Airline Schedule , National Airspace System Performance Analysis Capability , Schedule Development

    UVS Technology Issues

    Finn, Anthony / Scheding, Steve | Springer Verlag | 2010
    Schlagwörter: Performance Envelope , Sensor Schedule

    Organizational and technological aspects of the program of the construction companies

    Freier Zugriff
    T.V. Tkach / A.V. Radkevich | DOAJ | 2012
    Schlagwörter: Performance , an integrated network schedule enlarged