1–20 von 23 Ergebnissen
|

    Data driven production modeling and simulation of complex automobile general assembly plant

    Wang, Junfeng / Chang, Qing / Xiao, Guoxian et al. | Tema Archiv | 2011

    Optimization of predetermined standby mode transfers in 1-out-of-N: G systems

    Levitin, Gregory / Xing, Liudong / Dai, Yuanshun | Tema Archiv | 2014

    Predictive algorithm to determine the suitable time to change automotive engine oil

    Jun, Hong-Bae / Kiritsis, D. / Gambera, M. et al. | Tema Archiv | 2006

    Analysis of cable structures

    Peyrot, A.H. / Goulois, A.M. | Tema Archiv | 1979

    Finite element modelling of rolling contact

    Zeid, I. / Padovan, J. | Tema Archiv | 1981

    An improved Rectangular Element for plate bending analysis

    Armainos, E.A. / Negm.H.M. | Tema Archiv | 1983

    Computerized containership load planning: a methodology and evaluation

    Martin, G.L. jun. / Randhawa, S.U. / McDowell, E.D. | Tema Archiv | 1988

    Validation of finite segment cable models

    Huston, R.L. / Kamman, J.W. | Tema Archiv | 1982

    Simulation models as a tool for urban planning

    Eid, M.S. / Eldin, H.K. | Tema Archiv | 1980

    GSFC robotics research for space applications

    Ollendorf, S. / Nguyen, C.C. | Tema Archiv | 1991

    IMPROVING MOVEMENT OF WHEELED GROUND ROBOTS ON SLOPES USING LIDAR TECHNOLOGY: MAPPING, PLANNING, AND OPTIMIZATION

    Freier Zugriff
    Motion planning Israa M. Abdalameer / Murooj Khalid Ibraheem | DOAJ | 2023